Case Studies

Riverlight Development, London

Project: Seeking high quality wood flooring for this prestigious development, St James chose The Solid Wood Flooring Company to supply Oak and Walnut wood flooring
Client: St James
Main Contractor: St James
Sub Contractor: St James

Riverlight is the first building to be completed in the Nine Elms area of Battersea which surrounds the historic power station site. Comprising 813 new apartments spread across six jagged glass towers of diminishing size, the project commands an enviable location on the side of the Thames. The wood flooring was installed by Avis Mechanical. 

Seeking high quality wood flooring for this prestigious development, St James chose The Solid Wood Flooring Company to supply Oak and Walnut wood flooring. With a growing reputation for high dimensional quality and a high standard of durable finish, The Solid Wood Flooring Company manufactured two new products to add to their range of FSC certificated wood flooring and these complemented the overall quality and aesthetic appeal of the finished apartments.

Related Case Studies

Residential

London’s South Bank Luxurious Residential Complex

Read more
Residential

London Docks project for Berkeley Homes

Read more
Case Study
Residential

American Black Walnut Chevron Flooring – How to Finish

Read more
Residential

American Black Walnut Flooring

Read more

Get in touch

Questions or comments? If you can’t find the answer to your question on our site or want to leave some feedback, please fill in the form below.


    Join our mailing list

    Receive the latest news, offers and inspiration straight to your inbox.