Case Studies

Army Museum London

Project: Army Museum London | Case Study

The designers who did the Army museum refurbishment used our band saw CH E780 wide board 240mm to clad the walls. The images below show where they were installed.

You can clad ceilings and walls with our engineered wood flooring as long as a special coat of fire-retardant finish is applied. The CH E780 is finished with a commercial UV cured special oil that is more like a lacquer but very mat.

Please see below for the product used on this project and call us on  01666 504015 for any other information

Related Case Studies

Viking Museum with Oiled Oak Wood Flooring
Museums

Imaginative Wood Floor Installations (Jorvik Viking Museum)

Read more
Museums

Select White Oak in the Science Museum

Read more
Museums

Unfinished Oak in Jorvik Viking Museum, York

Read more

Get in touch

Questions or comments? If you can’t find the answer to your question on our site or want to leave some feedback, please fill in the form below.


    Join our mailing list

    Receive the latest news, offers and inspiration straight to your inbox.